EARLY PRODUCTION FACILITY

North Kuwait

Scope of Work: 

Design Verification, Installation & Commissioning of the Electrical & Instrumentation Network.

Brief Project Description:

Design Verification, Design Optimisation, Preparation of Detailed Drawings.

Installation, Testing and Commissioning of Electrical & Instrumentation Network.

Installation included laying of approximately 120 kms of Control, Lighting, Power (HT & LT) and Instrumentation

cables, Terminations, Installation of MCC/PCC Panels, Variable Frequency Drives (VFD’s), Installation of Transformers

(5 x 1000kVA), Installation & Testing of 4x6MVA Solar Gas Turbine, Lighting, Installation of Black Start Diesel

Early Production Facility
CLIENT:
Safwan Petroleum Technologies, Kuwait
MARKET:
Oil & Gas
SUB MARKET:
No sub category for Oil & Gas
STATUS:
completed