Scope of Work:
Design Verification, Installation & Commissioning of the Electrical & Instrumentation Network.
Brief Project Description:
Design Verification, Design Optimisation, Preparation of Detailed Drawings.
Installation, Testing and Commissioning of Electrical & Instrumentation Network.
Installation included laying of approximately 120 kms of Control, Lighting, Power (HT & LT) and Instrumentation
cables, Terminations, Installation of MCC/PCC Panels, Variable Frequency Drives (VFD’s), Installation of Transformers
(5 x 1000kVA), Installation & Testing of 4x6MVA Solar Gas Turbine, Lighting, Installation of Black Start Diesel